aboutsummaryrefslogtreecommitdiffstats
path: root/doc/manuals/chapters/configuration.adoc
diff options
context:
space:
mode:
Diffstat (limited to 'doc/manuals/chapters/configuration.adoc')
-rw-r--r--doc/manuals/chapters/configuration.adoc4
1 files changed, 2 insertions, 2 deletions
diff --git a/doc/manuals/chapters/configuration.adoc b/doc/manuals/chapters/configuration.adoc
index bcf3ad7c..6fc61c77 100644
--- a/doc/manuals/chapters/configuration.adoc
+++ b/doc/manuals/chapters/configuration.adoc
@@ -72,7 +72,7 @@ than the specified number of octets are left to be transmitted.
==== Downlink TBF idle time
After a down-link TBF is idle (all data in the current LLC downlink
-queue for thi MS has been transmitted), we can keep the TBF established
+queue for the MS has been transmitted), we can keep the TBF established
for a configurable time. This avoids having to go through a new one or
two phase TBF establishment once the next data for downlink arrives.
@@ -94,7 +94,7 @@ require any resources of the air interface.
==== Forcing two-phase access
-If the MS is using for a single-phase access, you can still force it to
+If the MS is using a single-phase access, you can still force it to
use a two-phase access using the `two-phase-access` VTY configuration
command at the `pcu` VTY config node.