Age | Commit message (Collapse) | Author | Files | Lines |
|
Currently the DSP is instructed to achieve a given uplink
power target but there are circumstances (e.g. EMV testing)
where we need more control over it. The "manual/software/osmo"
power control can only be implemented per TRX and not per
lchan. Add a very very basic control that checks the MS Power
used by the phone, the actual receive level and then adjust
the power.
The code doesn't take the history into account, if the phone
can not reach the requested power level the code will be stuck
(e.g. no timeout based on multiframes). It has a mode for a
fixed power control but no way to set it yet.
|
|
We need to build a lot more code to be able to test these two
new routines. I didn't want to move the code to a utils file
as the check is called from a hot path. Add accessors to the
inlined variant to be used by the unit test.
While writing the unit tests I noticed that a re-transmission
of the ciphering command would lead to an attempt to enable
ciphering again. I am not sure that this MphConfig is idempotent.
|
|
|
|
During development one switches from GSM900 to GSM1800 and GSM850 to
GSM1900. This commit attempts to make this switch more easy.
GSM1800 and GSM1900 have overlapping ARFCNs. This means that the
mapping from bands to arfcn is not injective. Because of that I
removed the code to deduce the band from the ARFCN. This was done
in commit 8c3d807b3fc785ffb18aeb97355150c92221e8a0. The auto-band
option allows to move between GSM900/GSM1800 and GSM850/GSM1900.
Add a simple testcase with these auto-band configurations.
|